Completed Projects - 2014


Agiba Petroleum Co. - Faras Oil Field

 

Location

Alexandria -

Marsa Matrouh

Year Completed

2014

System Installed

CO2 Systems

FM200 Systems

Owner

Agiba Petroleum Co.

Main Contractor

El-Mokhtar

EMC - Egyptian Maintenance Co.

Consultant

-

 

Administration Building Nile 66

 

Location

Cairo

Year Completed

2014

System Installed

Wet Pipe Sprinkler System

Fire Pump Station

Fire hose & hydrant Systms

CO2 Systems

FM 200 Systems

Owner

Nile Engineering Group

Main Contractor

Nile Engineering Group

Consultant

Bakry Consultant Engineering

 

LG Egypt New Factory

 

Location

Sharqia

Year Completed

2014

System Installed

CO2 Systems

FM200 Systems

Owner

LG ELECTRONICS EGYPT LGEEG

Main Contractor

HANKOOK  - Korea

Consultant

ACE - Moharram Bakhoum

 

Tahrir Garage

 

Location

Cairo

Year Completed

2014

System Installed

CO2 Systems

Fire Alarm System

Owner

Ministry of Justice

Main Contractor

Arab Contactors

Consultant

ACE - Moharram Bakhoum

 

Nuweiba City Port

 

Location

Sinai

Year Completed

2014

System Installed

CO2 Systems

FM200 Systems

Owner

Ministry of Transportation

Main Contractor

Arab Contractors

Consultant

Bakry Consultant Engineering

 

EVA Cosmetics Corp.

 

Location

Giza

Year Completed

2014

System Installed

CO2 Systems

Pre-Engineered FM-200

Owner

EVA Cosmetics Corp.

Main Contractor

Unisafe

Consultant

EKE – Elite Consolidated Engineering

 

National Telecom Regulatory Authority

 

Location

Giza

Year Completed

2014

System Installed

Kitchen Hood Systems

Owner

NTRA

Main Contractor

Unisafe

Consultant

-

 

Office of the Attorney General

 

Location

Cairo

Year Completed

2014

System Installed

CO2 Systems

Owner

Ministry of Justice

Main Contractor

Arab Contractors

Consultant

Arcplan

 

MOPCO

 

Location

Cairo  &Damietta

Year Completed

2014

System Installed

FM 200 Systems

Owner

Misr Fertilizers Production Co. (MOPCO)

Main Contractor

Unisafe

Consultant

-

 

Police Officers Club

 

Location

Cairo

Year Completed

2014

System Installed

Wet Pipe Sprinkler Systems

Fire pump station

CO2 Systems

FM 200 Systems

Owner

Ministry of Interior

Main Contractor

El Fath Contactors

Consultant

El Afifi Consultant

 

NCFC - 140

 

Location

Cairo

Year Completed

2014

System Installed

Wet Pipe Sprinkler System

Fire pump station

Water pump station

Fire Hose and Hydrant System

Pre-Engineered FM-200 Systems

Owner

New Cairo for Administration Buildings

Main Contractor

Redcon Spain Co.

Consultant

Architecture & Planning Group APG

 

FAISAL Islamic Bank - Azarita Branch

 

Location

Alexandria

Year Completed

2014

System Installed

CO2 Systems

FM 200 Systems

Pre-Engineered FM-200 Systems

Owner

Faisal Islamic Bank

Main Contractor

Alpha Industries & Construction

Consultant

Dr. Medhat Shawky

 

The Library of Alexandria

 

Location

Alexandria

Year Completed

2014

System Installed

FM 200 Systems

Owner

Bibliotheca Alexandria

Main Contractor

Unisafe

Consultant

-

 

National Bank of Egypt - Madinaty Branch

 

Location

Cairo

Year Completed

2014

System Installed

Wet Pipe Sprinkler Systems

Fire Hose Network

FM 200 Systems

Owner

National Bank of Egypt

Main Contractor

Alpha Industries & Construction

Consultant

Arcmid Consultant Engineering

 

Misr Al-Kheir Building

 

Location

Cairo

Year Completed

2014

System Installed

CO2 Systems

FM 200 Systems

Owner

Misr Al-Kheir Foundation

Main Contractor

Unisafe

Consultant

Misr Al-Kheir Foundation